Edge computer vision

Four problems. Four solutions.

Find the one that sounds like your plant. Most customers start with one and add the others later.

18ms

Edge latency

existing

Line setup

on-prem

Inference

< 2 days

Install time

Inspection · Cell 04Live
DEFECT · POROSITY
FRAME004821
LATENCY18 ms
CONFIDENCE0.974
VERDICTREJECT → BIN 3

01Surface Inspection

Bad parts stop at the cell.

Scratches, porosity, weld faults and dents, checked on every part instead of a sample. Tuned so it doesn't scrap good ones — a system that cries wolf gets switched off by month two.

For you if

Defective parts are reaching your customer.

You get

  • Screen at the cell
  • Reject signal at the line
  • Daily defect count

Cell 04 · live

POROSITY

Verdict · reject

02Part Records

The paperwork fills itself in.

A photo, a timestamp and a result saved for every part that goes down the line. Searchable afterwards, and exportable in the format the audit asks for.

For you if

Your customer is asking for quality records.

You get

  • Searchable part history
  • Excel and PDF export
  • Shift reports

Part history · shift B

PN-4471 · 14:02:11pass
PN-4472 · 14:02:14pass
PN-4473 · 14:02:18reject
PN-4474 · 14:02:21pass

03Size Checking

Every part measured. Not every fortieth.

Checked against your drawing without touching the part, at line speed. Drift is flagged when it starts, not when the batch is already made.

For you if

Manual gauging is slowing your line down.

You get

  • Go / no-go per part
  • Drift alerts
  • Measurement log

Dimension check

42.03 mm · in spec

04Assembly Check

It holds the part until the step is right.

Confirms every component is present, correct and the right way round before the part moves on. Missing fastener, reversed bracket, wrong variant for the order.

For you if

Wrong or incomplete assemblies are getting through.

You get

  • Stop signal at the cell
  • Step-by-step check
  • Operator prompt

Assembly · station 2

Bracket seated
Fastener × 4
Orientation
!Label applied

Line held

Not sure which one?

Tell us what’s going wrong and we’ll tell you what it takes to fix it. Screens on this page are illustrations. Surface inspection runs today; the others are built as deployments call for them.

Talk to us